From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 12:02 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Michael Savage 

Last updated:  03/27/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Clayton, NC  27527
US

mikealsavage@gmail.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Planner Scheduler Manager

Resume Value: p4uy9zjv3nrjcdvx   

  

 

Michael Savage  

Mikesavage80@gmail.com             33 Twin Pines CT, Clayton, NC 27527               919-389-3105

 

Professional experience

03/2015 – Present          Phoenix Solar (Duke Energy) Fayetteville, NC

Construction Manager

§ Manages staff of 50+ electricians and laborers for the construction of solar energy sites.  Currently built a total of 46MWs (production size) throughout North Carolina

§ Created a 3 week look-ahead schedule for employees to ensure construction process runs effectively.  Utilizes P6 Primavera and MS Project for scheduling.  Schedule includes estimated labor hours, production totals, and material delivery dates.

§ Designed a daily report summarizing all material deliveries, production achievements, labor hours, safety concerns, and environmental impact.  Created metrics for customer from report data.

§ Performed Quality Control on PV module installations, racking systems, and wire connections to ensure design criteria is being met.

 

07/2013 – 02/2015   Ranbaxy pharmaceuticalsNew Brunswick, NJ

Maintenance Planner/ Supervisor

§ Tasked with creating a calibration, Preventative Maintenance, and corrective maintenance program for two pharmaceutical production facilities and an associated warehouse. 

§ Developed process of scheduling mechanical contractors, scheduling on-site mechanics (14 total mechanics), ordering equipment spare parts, and coordinating shut downs with production supervisors. 

§ Compiled Data management handled through SAP database and MS Project. Site adheres to strict GMP and FDA standards (frequently audited).

§ Created metrics for Engineering and Maintenance departments and presented at daily meetings.  Metrics designed to review schedule effectiveness, site backlog, and equipment downtime for repairs.  Metrics created through pivot tables and graphs via MS Excel. Trends analyzed and reviewed for business demands.

§ Created Task Lists, BOMs, Equipment, and PMs in SAP database.  Task lists are created with OEM and maintenance input in addition to personal expertise. 

§ Managed a team consisting of an Engineering Support Specialist and Engineering Administrator.

§ Tasked with modifying existing HEPA testing program and cut site visits down substantially while still ensuring units are in compliance ($220,000 a year cost savings).

§ Implemented basic PdM program with Infrared thermography, steam trap testing, and vibration analysis.

§ Trained all operators and mechanics on proper use of different functionality within SAP. 

 

11/2007 – 07/2013   Merck (Jones Lang LaSalle)Rahway, NJ

Planner/ Scheduler

§ Responsible for planning and scheduling maintenance tasks and facility operations for approximately 18 mechanics of various skill sets (electrical, pipefitting, HVAC, instrumentation, carpentry) in both GMP and non- GMP buildings.  Site is approximately 400 acres.

§ Developed a vast number of work orders utilizing the Job Plan field and using Maximo 4.1, Primavera 6, and SAP to map out job estimates and schedule duration of jobs.

§ Managed facility upgrade projects to include glass washer replacement, chiller replacements, and door and window replacements throughout entire facility. 

§ Provided maintenance supervision for employees during 6 month transition period of maintenance supervisor (while also continuing planning and scheduling duties).

§ Helped to develop new Excel metrics tool and Microsoft Project Gantt charts for schedules.  

§ Helped create new reports and variants through transition from Maximo to SAP

§ Work with integrated supplier to find and purchase materials at a preferred cost (Turtle and Hughes and IDG).

§ Managed elevator service, Chiller logs, and clean water contracts for routine maintenance.

 

2/2005 - 11/2007  Bristol-Myers, SquibbPlainsboro, NJ

Planner/Scheduler

§ Responsible for writing Job Plans and Job Hazard Analysis, estimating work hours, coordinating contracts with outside vendors, and scheduling work through Maximo, Primavera 6, and Microsoft Project. 

§ Responsible for planning labor for 21 maintenance mechanics and carpenters through ordering parts and materials for 6 separate office facilities.

§ Responsible for scheduling wrench time and all non-wrench time hours for all mechanics.

§ Responsible for establishing PM frequencies and working with predictive maintenance technologies such as infrared thermography and mechanical ultrasound. 

§ Required to maintain documents for any change control process.

§ Responsible for supervising the help desk personnel (3 employees).

§ Fully responsible for setting up all front end applications and training users at satellite site (Montreal) CMMS (Maximo).

 

6/2003 - 2/2005 Bristol-Myers, SquibbPlainsboro, NJ

Maximo Database Analyst

§ Responsible for creating, maintaining and organizing all front end data for the sites shared Work order database. 

§ Responsible for training technicians for use of the database (Maximo).

§ Worked with RCM team on infrared thermography scanning and mechanical ultrasound tours.  Helped analyze findings from vibration analysis reports.   

§ Responsible for writing reports in MS Excel, Access, and Project that link with the Maximo database (through Crystal reports)

 

(Prior Experience available upon request)

 

 

 

Education

3/2011    Mercer County Community CollegeWest Windsor, NJ

Business Management AAS Degree

 

Qualifications and Certifications

 

§        Fluent in Microsoft Project, PowerPoint, Word, and Excel.  Excel        expert certification.

§        Low Pressure Black Seal Boiler Operator license.

§        HVAC Level 1 Refrigerant license.

§        Marshall Institute Planning/Scheduling Certification.

§        Life Cycle Engineering Planning/Scheduling Certification.

§        HSBRT Job Plan writing certification.

§        Dale Carnegie Networking/Dale Carnegie Management Certification.

§        Strong SAP, Primavera P6, and Maximo skills.

§        NASM MMA Certified Personal Trainer.

§        CPR Certified.

 

 

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Facilities Planner/ Scheduler

Jones Lang Lasalle Americas, Inc.

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Years of relevant work experience:

2+ to 5 Years

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Planner Scheduler Manager

 

Target Company:

Company Size:

Occupation:

Engineering

·         Bio-Engineering

·         Chemical Engineering

Manufacturing/Production/Operations

·         Operations/Plant Management

 

Target Locations:

Selected Locations:

US-NC-Raleigh/Durham-RTP

Relocate:

Yes

Willingness to travel:

Up to 25% travel